Domestic Value Engineering for Construction Materials
Lower material costs without compromising design intent or durability by leveraging Port2Site's nationwide VE network.
What Domestic VE Means for Your Project
Value engineering is not about cutting corners. It is about finding equal-quality alternatives that reduce cost while maintaining performance, aesthetics, and code compliance.
Spec-Matched Alternates
Products that meet or exceed original spec requirements from trusted U.S. manufacturers.
Faster Lead Times
Domestic sourcing means shorter lead times - often 2-4 weeks vs 10-14 weeks for imports.
Lower Total Material Cost
Save 10-25% on material costs through strategic alternate sourcing and multi-quote comparisons.
When Domestic VE Is the Ideal Strategy
Best For:
- Compressed timelines
- Mid-project changes
- Warranty-supported items
- Small or phased deliveries
Use Imports Instead When:
- Long lead time flexibility
- Bulk repetitive materials
- Tariff exposure favors imports
Our Step-by-Step VE Process
Plan & Spec Review
Alternates & Options Identified
Side-by-Side Pricing Matrix
Samples, Submittals & Approval
Sample Pricing Comparison
| Category | Spec Price | VE Alternate | Savings |
|---|---|---|---|
| LED Downlights (100 units) | $4,500 | $3,960 | 12% |
| Lavatory Faucets (50 units) | $7,500 | $6,375 | 15% |
| LVP Flooring (10,000 SF) | $35,000 | $31,500 | 10% |
Categories We Commonly VE
Lighting
Plumbing fixtures
Flooring (LVP/tile)
Cabinets & vanities
Doors & hardware
Mirrors & accessories
Electrical devices
VE With Port2Site vs Typical Distributor Substitutions
| Traditional Distributor | Port2Site VE |
|---|---|
| Inventory-driven swaps | Spec-driven alternates |
| Limited transparency | Full cost breakdown |
| Single channel | Multi-channel VE + imports |
| Margin unknown | Transparent pricing |
Examples of VE Savings
12%
Lighting savings
15%
Plumbing savings
10%
Flooring savings
Domestic VE FAQ
What does value engineering actually mean?
VE means finding equal-quality alternatives that cost less while maintaining design intent, performance, and code compliance.
Will VE alternates look different from the original spec?
We prioritize spec-matched alternates that maintain the same aesthetic, finish, and style as the original selection.
How long does the VE review process take?
Most VE reviews are completed within 3-5 business days, including pricing comparisons and alternate recommendations.
Do VE alternates come with warranties?
Yes. We only recommend alternates from reputable U.S. manufacturers with standard commercial warranties.
Can I combine domestic VE with imports?
Absolutely. We often recommend a hybrid approach to maximize savings while meeting timeline constraints.
What information do you need to start a VE review?
Send us your fixture schedules, spec sheets, or plans. We will identify opportunities and provide pricing within a few days.
Need a Second Set of Eyes on Your Specs?
Upload your plans or fixture schedule and let our team identify VE opportunities for your project.