Factory-Direct Import Sourcing for Construction Materials

Source lighting, plumbing, flooring, cabinets, doors, hardware, and more directly from vetted manufacturers around the world - with full logistics, tariffs, quality control, and landed cost management handled by Port2Site.

What Factory-Direct Sourcing Means for Developers & GCs

Skip the middlemen and source construction materials directly from qualified overseas manufacturers with complete transparency on pricing, quality, and logistics.

Remove Distributor Markups

Eliminate 3-5 layers of margin typically added by importers, distributors, and dealers.

Global Factory Access

Tap into vetted manufacturers across China, Vietnam, Malaysia, Turkey, Mexico, and more.

Transparent Landed Cost

See every cost layer - factory, freight, tariffs, customs - before you commit.

Port2Site eliminates 3-5 layers of distributor markup commonly found in traditional procurement.

Our Multi-Country Manufacturing Network

We source from a curated, proven network of manufacturers across tariff and non-tariff regions.

CountryStrengthsTypical Categories
ChinaHigh capacity; broad product rangeLighting, plumbing, accessories
VietnamStrong alternative to ChinaLighting, hardware
MalaysiaNon-tariff benefitsPlumbing, accessories
TurkeyStylish architectural materialsTile, flooring
MexicoNear-shore advantagesHardware, doors
United StatesWarranty & speedVE alternates

Categories We Commonly Import Direct

Lighting fixtures (indoor/outdoor/site)

Plumbing fixtures & bath accessories

Flooring & tile

Cabinets & vanities

Doors, frames, hardware

Electrical devices

Mirrors

FF&E for amenities

Our End-to-End Import Workflow

1

Specs & Plans Review

2

Factory Selection & Quotations

3

Samples, Approvals & Production

4

Freight, Customs & Tariffs

5

Port-to-Site Delivery & Consolidation

From RFQ to jobsite delivery - one partner, one chain of custody.

Transparent Landed Cost Comparisons

Cost LayerIncluded?
Factory price
Inland freight
Ocean freight
Tariffs/duties
Brokerage
Drayage
Final delivery

When Direct Import Is the Right Move - And When It Is Not

Imports Make Sense When:

  • 50-500+ units
  • Repetitive SKU usage
  • Timelines allow production
  • Significant savings available

Domestic VE Better When:

  • Urgent timelines
  • Warranty needs
  • Localized code constraints
  • Small quantities

Direct Import in Action

120-Unit Multifamily (FL)

$240K saved on lighting + plumbing

Caribbean Resort

Mixed FF&E containers

Workforce Housing

Import flooring savings across phases

Direct Import FAQ

What is the minimum order for direct imports?

We recommend projects with 50+ units or $50K+ in material value to maximize container efficiency and savings.

How long does the import process take?

Typical lead times are 10-14 weeks from order to jobsite, including production, shipping, and customs clearance.

How do you handle quality control?

We conduct pre-shipment inspections, require factory test reports, and provide sample approval before production begins.

What about tariffs and duties?

All tariffs and duties are included in our landed cost quotes. We also offer multi-country sourcing strategies to minimize tariff exposure.

Do imported products meet U.S. codes?

Yes. We only source products with proper UL/ETL/CSA certifications and provide full compliance documentation for inspections.

Can you combine imports with domestic sourcing?

Absolutely. We often recommend a hybrid approach - imports for high-volume items and domestic VE for time-sensitive or warranty-critical products.

Ready to Explore Factory-Direct Imports?

Upload your plans or fixture schedule and talk with a procurement specialist about your import options.